In 2024, DRW was proud to support a major infrastructure upgrade at Beattock Primary School, located in Dumfries and Galloway. Commissioned by Dumfries and Galloway Council and delivered in partnership with main contractor Ashleigh Construction, this project involved a full roof replacement and comprehensive electrical refurbishment across the school.
DRW’s specialist team was responsible for a wide range of electrical and solar-related services, including:
- • Solar PV Panel Management:
- Full strip-off and safe removal of existing solar photovoltaic panels
- Reinstatement and reconfiguration of the PV system following roof replacement
- Ensuring optimal performance and compliance with current energy standards
- Electrical Infrastructure Renewal:
- Complete replacement of containment systems for small power, data, and lighting
- Installation of new cabling and wiring throughout the building
- Upgrades to meet modern safety and efficiency standards
- Lighting Upgrade:
- Installation of high-efficiency Thorlux LED lighting across all teaching and communal areas
- Improved energy performance and lighting quality for staff and pupils
- Integration with smart controls where applicable
Project Delivery
This project was delivered on time and within budget, with careful coordination between DRW, Ashleigh Construction, and Dumfries and Galloway Council. Our team worked diligently to minimize disruption to school operations, ensuring a safe and efficient working environment throughout the refurbishment.
Sustainability & Impact
The upgraded solar PV system and LED lighting installation contribute significantly to the school’s sustainability goals, reducing energy consumption and carbon footprint while improving the learning environment.

















